#2719 Home #2719 Schedule #2719 Specifications

Restoration work on the:

 The pictures are big, but they show some good detail!

 

This is how we received the 2719,

needing  piston work and all in pieces.

 

 

 

In this picture, there is no piston built yet. 

The pistons have to be made from scratch, and then installed.

 

Piston work completed on the left side of the 2719, all created from scratch!    This is some really amazing work done by our volunteers!

 

 

 

With the left side completed, she's half  way there!

 

 

She has her bell in place!

Inside the 2719 cab 

 

You cant see anything in front of the train  from the seats.  The Engineers would have had to lean way outside the windows to look for signals.

Can you imagine yourself shoveling that coal on a 90+ degree day  with  a 65-77% dew point?  If you have, share your story on our guest  book!   We'd love to hear it!  Tell us how you made it through those days!

 

 

 

The Soo Line #2719 in Duluth

Ken Buehler
218-733-7590